Charakteristika
A railway overpass with a total length of 855 m as part of the Modernization of the Soběslav (outside) – Doubí u Tábora section, which transfers the railway body in a new track over the Soběslav – Sedlečko track and Černovický potok.
Client/Investor
Správa železnic, s.o.
Author/Processors
Ing. Petr Zobal - Chief project engineer, Ing. Jan Pešata - Bridge designer
Construction realization and contractor
Metrostav a.s. (Divize 5) a Eurovia
Completed
12/2022





