Charakteristika
The initial section of the tunnel complex of the remaining unrealised part of the City Ring Road is led in the connecting tunnels Bílá Skála and Kolčavka. The tunnels are both bored and excavated with a total length of approximately 2.9 km. An excavated exploratory tunnel with a length of 1133 m is designed as part of a detailed geotechnical survey.
Client/Investor
Prague City, Investment Department
Author/Processors
Chief engineer of 8313: Ing. Zbyněk Froněk, Chief engineer of 0081: Ing. Michal Turek, tunnnels solution: Ing. Jan Korejčík
technological objects: Ing. arch. Pavel Sýs, chief project coordinator: Ing. Pavel Šourek, SATRA spol. s.r.o., main architect: Ing. arch. Jan Kasl, JK Architekti s.r.o
Construction realization and contractor
Bíla Skála exploratory tunnel design including the plan of the getotechnical monitoring within the documentation of detailed geotechnical survey.
Completed
09/2022 - an application for a decision on the location of the building was submitted
12/2023 the documentation of detailed geotechnical survey was completed
01/2024 the documentation of geotechnical monitoring during the excavation of the exploratory tunnel was completed
Subject of the work
Documentation for Zoning Decision of Bílá Skála and Kolčavka tunnels including technological objects.