Charakteristika

Linear construction of the optimization of the Čelákovice (excluding) – Mstětice (including) track section, located on the Lysá nad Labem – Prague Vysočany line, in the section from the existing km 8.770 to km 15.113. The design stationing of this section  is km 8.763-14.546. The construction remains partly on the existing land, except for the Čelákovice relocation section (approx. 1.9 km long, which is now routed in a straighter line through the existing partially built-up local area of Záluží) and the Mstětice relocation (approx. 1 km long, in front of the Mstětice railway station, which is now routed in a gentler curve through open countryside outside the existing railway perimeter). 

Client/Investor

Správa železnic, státní organizace

Author/Processors

Chief Engineer: David Benda, Transport and operation technology: Ing. David Pöschl, Architecture: Ing. arch. Michaela Kulhavá

Construction realization and contractor

Company association Mstětice: Eurovia CS, a.s., Subterra a.s., GJW Praha spol. s.r.o., Elektrizace železnic Praha a.s.

Completed

Project was completed in 12/2020, construction was completed in 09/2025