The project documentation of the construction is primarily solving the repair of the waterproofing system and the renovation of a significant part of the external ceiling structure. The construction is located in an area with heavy traffic, which requires the least possible restrictions of surface transportation, station and also the entire metro line C operations. The scope of the construction is visible from the picture P01 – coordination situation - the graphic attachment in the photo gallery. The conclusions from coordination with the prepared or already implemented, constructions of foreign investors in the Florenc C station location are limiting time and spatial influences for the construction solution. The construction is also coordinated with other prepared constructions of Dopravní podnik hl.m. Prahy in this station. The basic linkage is the coordination of the scope of staged excavations in the interior of the station and on the surface so as to guarantee the necessary functionality of the transport and access routes in the vicinity of the construction, including the Florenc C station itself.

Client/Investor

Dopravní podnik hl. m. Prahy, akciová společnost

Author/Processors

Chief engineer: Ing. Jaroslav Sedmidubský, architect: Martínková Alena, construction: Ing. Jonášová Dagmar, Adam Figura, Ing. Štěpán Vosáhlo (all METROPROJEKT Praha a.s.), HABENA, spol. s r.o., statics: Ing. Jaroslav Kelíšek, HABENA, spol. s r.o., Pontex, spol. s r.o., technology: Ing. Věra Langmaierová, trafic solution: Ing. Petr Vopařil, construction organisation: Ing. Petr Ocásek, fire security solution: Ing. Petr Hladký

Construction realization and contractor

Metrostav DIZ, závod 8, a GEOSAN GROUP

Completed

Estimated construction time 03/2022–12/2026

Subject of the work

Documentation for building permit, for the selection of the contractor for building construction, documentation of the actual execution, author's supervision, engineering